1-877-780-2131
Special Offers - Limited Time - Limited Quantities - Click for Details
LSI
Acrobat icon Acrobat Reader
Required to view PDF files
Flash icon Flash Player
Required to view videos
Site Home > Service & Support > Support Articles > Switching Quick Change Load Cells

Switching Quick Change Load Cells

Quick Change Load Cell Procedure

If your tester was ordered with Quick Change Load Cells, they are easily switched as needed for testing.

1. Turn off the tester completely when changing load cells.

2. Clean the platform and load cell base prior to installation.

3. Carefully slide the load cell base onto the platform, making sure the 9-pin connection is properly aligned.

4. Firmly push the load cell toward the tester frame. Tighten the front handle, then tighten the rear handle. Retighten the front handle.

5. When using a 550 lb or 1,000 lb load cell, you must install two cap screws into the upper load cell bracket. Torque to 26 ft-lb.


Quick Change Load Cell Procedure Quick Change Load Cell Procedure

Click images to enlarge.

 

Top icon
Larson Systems Inc.
13847 Aberdeen Street NE
Ham Lake, MN 55304
Phone: 763-780-2131
Fax: 763-780-2182
Top icon
LarsonSystems.com    |    SpringTesters.com    |    SpringGages.com
LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI